LogoComplianceHub
Live Compliance Engine — v4.2.1

Watch your grid snap from red to green.

ComplianceHub turns NERC CIP updates, interconnection queue chaos, and SEC emissions filings into automated audit trails — flagging violations before they become seven-figure fines.

compliance-hub — audit-engine
$ hub audit --scope all --iso all
▸ Connecting to NERC SERC... OK
▸ Fetching CIP-015-1 requirements... OK
▸ Scanning 6 ISO interconnection queues... OK
▸ 2 violations detected → auto-remediating...
✓ Audit complete. Compliance score: 97.4%
NERC SERC Certified
SOC 2 Type II
FERC CISA Aligned
Regulation Tracker — Live
2026-02-24 12:44:32 UTC
Active Standards
CIP-015-1
COMPLIANT
72%
CIP-013-2
COMPLIANT
88%
CIP-007-6
REVIEW
61%
ORDER-2023
COMPLIANT
94%
Dependency Graph
LINKING NODES...
$2.1B
NERC penalties since 2019
$10M
Largest single CIP fine ever
2,600
GW stuck in interconnection queues
68%
Interconnection studies issued late in 2022
60
New grid vulnerability points added daily
01 — NERC CIP Compliance
"$10M fine for 127 CIP violations — the organization had a compliance program. It just wasn't good enough."

Every NERC CIP standard, automatically tracked and audited in real time.

FERC approved CIP-015-1 on July 2, 2025 — addressing blind spots inside the electronic security perimeter. The U.S. grid gains 60 new vulnerability points per day. ComplianceHub monitors every standard update, maps your assets, and flags deviations before a NERC auditor does.

CIP-015-1CRITICAL
Internal Network Security Monitoring
Approved: Jul 2, 2025
97
CIP-013-2HIGH
Supply Chain Risk Management
Approved: Active
99
CIP-007-6HIGH
Systems Security Management
Approved: Active
91
CIP-003-9MEDIUM
Security Management Controls
Approved: Active
100
Penalty Exposure Calculator
$1M
Per violation
/day max
$284K
Avg settlement
2024 avg
$0
Your exposure
with Hub
NERC CIP Monitor
127 checks passed
ALL CLEAR
Network monitoring dashboard showing compliance status indicators and data flow visualization
23
Standards Monitored
847
Auto-Remediated
12,441
Audit Trail Entries
312
Days Since Violation
02 — Interconnection Queue
"2,600 GW waiting for grid access. Only 13% of 2000–2019 requests ever reached commercial operation."

Six ISOs, one unified queue view — FERC Order 2023 compliance built in.

The average project now takes 5 years from request to commercial operation — up from 2 years in 2008. Cluster studies, first-ready/first-served criteria, and cost-allocation methods shift constantly across RTOs. ComplianceHub tracks every procedural update across PJM, MISO, CAISO, ISO-NE, NYISO, and SPP, alerting you the moment your project's status changes.

Queue Tracker — 6 ISOs
10,300 active projects
Wind turbines and solar panels in a renewable energy field representing interconnection queue projects
PJM
847 projects
312 GW
SYNCED
MISO
623 projects
248 GW
SYNCED
CAISO
441 projects
187 GW
SYNCED
ISO-NE
198 projects
74 GW
SYNCED
NYISO
312 projects
118 GW
SYNCED
SPP
287 projects
94 GW
SYNCED

FERC Order 2023 Cluster Tracking

Automatically monitors cluster study groupings, first-ready/first-served queue position, and deposit deadlines across all 6 ISO regions.

68% of studies issued late in 2022

Multi-ISO Procedure Divergence Alerts

When MISO updates its cost-allocation methodology or CAISO revises its interconnection agreement template, you get a diff-view alert before your filing deadline.

5-year avg time to commercial operation

Queue Position Risk Scoring

Predictive modeling scores your project's withdrawal risk based on queue congestion, study delays, and cost estimate volatility — updated weekly.

Only 13% ever reach commercial operation

Interconnection Agreement Audit Trail

Every revision to your IA is logged, timestamped, and cross-referenced against the relevant RTO tariff provision — ready for FERC inquiry.

1,400 GW of generation in active queues
03 — ESG & Emissions Reporting
"95% of institutional investors still assess ESG risks in 2025 — and California's SB-253 reaches 10,000 U.S. companies regardless of SEC status."

Scope 1, 2, and 3 emissions reporting that holds up under scrutiny — from the SEC, California, and the EU simultaneously.

The SEC climate disclosure rule mandates reporting for large accelerated filers starting December 31, 2025. California SB-253 independently requires Scope 1, 2, and 3 emissions from 10,000 U.S. companies beginning 2026. ComplianceHub maps your GHG inventory across all overlapping frameworks, surfaces discrepancies before auditors do, and generates audit-ready filings in each required format.

GHG Inventory — Real-Time (tCO₂e)
Scope 1
0.0ktCO₂e
Direct combustion, process emissions
Scope 2
0.0ktCO₂e
Purchased electricity & steam
Scope 3
0.0ktCO₂e
Value chain, T&D losses
Regulatory Framework Coverage
SEC 10-K Climate
Dec 31, 2025 (LAF)
ACTIVE
California SB-253
2026 (10,000+ co.)
ACTIVE
California SB-261
2026 Climate Risk
ACTIVE
EU CSRD
Phase-in 2024–2028
MONITORING
Cross-Framework Divergence Detected
SEC requires material Scope 1+2 only → CA SB-253 requires ALL Scope 3 categories
CSRD assurance level exceeds SEC requirements → use highest standard for all
California deadline precedes SEC Phase 1 → filing sequence optimized
ESG Filing Dashboard
4 frameworks
READY
Financial compliance dashboard showing ESG reporting metrics and emissions data charts
4
Frameworks Mapped
2,847
Data Points Verified
94%
Filing Readiness
Limited
Assurance Level
Every meter. Every node. Every filing.

The exhale when everything clicks into compliance.

Join compliance teams at IOUs, co-ops, and independent generators who've automated their NERC CIP, interconnection, and ESG audit trails — and haven't paid a penalty since.

No credit card · Audit results in under 4 minutes · Runs on your infrastructure